Permitting and Interconnection

Engineering work and supporting documents are subject to the following permits:
  1. Transformer Relocation permit –  SDGE Application and confirmation of specifications already underway.
  2. San Diego County Air Pollution Control District - Air Quality permit.
  3. City of San Diego -- building, electrical and plumbing permits.
Responsibility for securing project permits is vested in Solana Energy, with drawings and technical assistance from the Contractor and the electrical engineering subcontractor. 

I
nterconnection of the Capstone microturbines requires SDGE review and approval.

SDG&E Interconnection Application
Emissions from Capstone C65 Units - Technical Reference
San Diego Air Pollution Control District (SDAPCD):
- AQ permit 116 application form

- Application Guide
- Application Checklist
- Permit fees


Powered by Create your own unique website with customizable templates.
  • Home
  • About
    • Case Study
    • For Building Owner/Users
    • REITS Owner/Users & Realtors
    • Transform Energy Asset
    • Mission & Careers
  • Contact