Transformer Relocation

An electrical contractor is required to complete relocation of the SDGE transformer on this site. SDGE will specify and permit the relocation. This work requires close coordination to minimize disruption to New Leaf production schedules.

This contract requires the following:
  • Electrical interconnection to the relocated Transformer and the new microturbine.
  • Replacement of current Distribution Panel, including trenching.
Solana Energy met with SDGE January 15 to review the specifications for this work.  Next steps:
  1. Solana Energy to provide a) Requirements Document and b) Electrical One-line.
  2. SDGE will approve the specifications and issue a permit for transformer relocation.
  3. Solana Energy will specify the electrical contractor based on responses to this bid.
The contractor will work cooperatively with Solana Energy to complete this phase of the project by supplying a one-line and performing the install of the electrical cabinet, trenching the line; and laying all requisite cable.


New Leaf will complete the rough work including the cut-out and the basic fencing.


System Schematic by Solana Energy
Request for Quote SDGE
Overview of Transformer Location
Facility Layout
Physical Inset of Transformer

Powered by Create your own unique website with customizable templates.
  • Home
  • About
    • Case Study
    • For Building Owner/Users
    • REITS Owner/Users & Realtors
    • Transform Energy Asset
    • Mission & Careers
  • Contact