windsun_data_package.pdf | |
File Size: | 908 kb |
File Type: |
LINK to files and folders associated with Phase 1 Design ... Maintained by Solana Energy and related professionals. Prepared for the client, Alliance Green Builders (AGB) ... Principals are Rich Williams and Jeff Adams.
- An excellent blog about the project as conceived by AGB.
- LINK to the use of energy at the current residence.
- Project Overview found at the above LINK.
- Power Point for the PowerWise Energy Management System selected by Rich Williams of AGB.
- The Energy Project Requirements Statement by Rich Williams of AGB.
- Folder containing energy calculations performed by Luke Morton FGY, Architecture and Planning. Folder of existing loads at the current residence of the owner, indicative of prospective loads.
- On Nov 14, AGB confirmed to Lane that the project will have a wind asset. Lane incorrectly thought that this element had been deleted. The provider of the wind asset is Joe Moore of Windsun, a local contractor who is likely to install the asset. The model that Rich Williams and Jeff Adams have approved is the Vision Air Wind 5.
Schedule and Documents:
- Nov-15 to Nov-24: Complete Revisions to Design. Jack Hegenauer to lead the calculations of the energy budget supported by AGB including Luke Morton, providing Environmental and Architectural services. Joe Moore is available for information on the Wind Turbine. Jesse Heilig is available for Construction and services to the property including electric.
- Current Design Schematic.
- Fri-Nov-14 Design Review at BSE Engineering.
Project Collaborators:
Lane Sharman - Solana Energy Design Lead.
Jack Hegenauer - Battery Chemistry, EV, Forecast Model.
Bob Caldwell - Controls Programmer and Engineer.
Alan Brown - PE and Electrical Engineer (BSE Engineering).
Larry Slominski - Electrician and Solar Contractor.
Joe Moore - Wind turbine contractor.
Luke Morton - Environmental and Architecture.
Jesse Heilig - Construction Supervisor.
Lane Sharman - Solana Energy Design Lead.
Jack Hegenauer - Battery Chemistry, EV, Forecast Model.
Bob Caldwell - Controls Programmer and Engineer.
Alan Brown - PE and Electrical Engineer (BSE Engineering).
Larry Slominski - Electrician and Solar Contractor.
Joe Moore - Wind turbine contractor.
Luke Morton - Environmental and Architecture.
Jesse Heilig - Construction Supervisor.